Power Supply for Central Control Platform

The power supply for electricity plants’ control center has to be with redundancy design so that to make sure it never lose control of the entirely electricity production – which might be caused by the unstable yield rate of photovoltaic or wind turbine. Despite of conventional ACDC offline power source and distributed DCDC converters for each function units, storage battery or UPS also should be always implement-ted for back up of necessary standing by or unexpected mains shunt down accidents.


Suggested Codaca Products : CPSQ / CPTR / TCB / PK / PKS / SPBL / SPRH / CPER / CPCE (Lr) /  CSCF / VSRU / CSEC / CSEB / CSFU / CSFI (Lout)

Related product